Northline Digital Studios

Skip

Northline Digital Studios
£800 — £1,000

Stonebridge Construction

Stonebridge — London · Surrey
05 / 12London · Surrey2023

Main contractor · Est. 1994

Drawn properly.
Built to last.

Refurbishment, extension and fit-out across London and the Home Counties, delivered by directly employed trades on a programme you can hold us to.

£4.2m largest contract96% on programme18 live sites
Scroll

96%

On programme

£4.2m

Largest contract

31

Years trading

18

Live sites

The work

Four ways we take a building on.

Each service is priced from drawings, sequenced with you, and run by a site manager who is on site.

Load-bearing change, underpinning and steel frames across buildings that stay in use while we work.

  • Temporary works design
  • Sequenced around occupants
  • Party wall coordination
Borough Works — structural phase, Southwark

Borough Works — structural phase, Southwark

Refurbishment · London · 2025

Materials

Specified to survive the next owner.

The four materials that turn up on almost every Stonebridge site, and why.

Cleaned and re-laid where the existing bond is worth keeping. Matched by hand, not by catalogue.

Download the material schedule

London stock

Reclaimed

Materials01 / 04
Borough Works — structural phase, SouthwarkLondon · Surrey2023

How we run a site

A site manager. Every day. Not a WhatsApp group.

Directly employed trades, one site manager per project, and a weekly programme you can read in a minute. It is not glamorous, and it is why the work lands.

  • 01Directly employed trades, not subcontracted chains
  • 02Weekly programme issued every Friday
  • 03Snagging closed before handover, not after
  • 04Twelve-month defects period, answered

The detail

London · Surrey — built to be looked at closely.

03 plates · 01 film
Stonebridge — lead detail
Directly employed trades, not subcontracted chainsRefurbishment · London · 2025
Stonebridge — second plate
Weekly programme issued every FridayBorough Works — structural phase, Southwark
Stonebridge — film still
Snagging closed before handover, not afterStonebridge · silent loop

The build — film

Borough Works · Southwark · 2025

  1. 01

    Strip out

    Fabric taken back to the frame so nothing structural hides behind a finish.

  2. 02

    Structure

    Steel, temporary works and party wall sign-off before anything closes up.

  3. 03

    First fix

    Services, insulation and boarding sequenced to the weekly programme.

  4. 04

    Finish

    Joinery, stone and paint — handed over with snagging already closed.

In their words

“Clients do not remember the steel. They remember that we told them the truth on a Thursday when the news was bad.”

Managing director, Stonebridge

Build sheet

How it was made.

Every build is hand-written, not templated: a bespoke layout system, custom motion, and content authored for the business it belongs to.

BrandWebsiteProject index
ClientStonebridge
SectorExtensions & Renovation
Delivered2025
ScopeIdentity, site, project archive
BuildReact · Base44 · custom motion
StatusLive

Selected projects

Contracts on the books.

2023 — 2025
Borough WorksSouthwarkMixed-use refurb · £4.2m2025
Lansdowne CrescentNotting HillWhole-house · £2.8m2024
The Old MaltingsGuildfordHeritage · £1.6m2023

The company

Thirty-one years, two generations, and a workshop full of drawings from jobs we would happily build again.

1994

Founded

46

Direct trades

96%

On programme

18

Live sites

Tenders

Send us the drawings. We will tell you the truth.

Request a tender

Tenders returned in ten working days

© 2026 StonebridgeNorthLine
Arclight Developments — Property development